Umesh Mali
May 12, 2014 10 minute read
SAP REM full cycle scenario with basic step
Follow RSS feed Like
45 Likes 49,453 Views 52 Comments
Repetitive Manufacturing(REM)
Company manufactures product in large numbers and produc on is quan ty based and period based not
order based.
Repe ve manufacturing is mainly used for the produc on scenarios with high product stability, high repe on
rates, and low product complexity.
In master data produc on versions and cost collector is must where this is not mandatory in discrete
manufacturing.
Applica on Areas:
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more
Tact-based Flow manufacturing
Period based produc on
Mass produc on
Difference b/w Discrete and REM
[Link] manufactures product in large,period based not… 1/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
REM Prerequisite
a. REM Profile
b. REM Indicator
c. Produc on Version
d. Product Cost Collector
SAP REM Full Cycle scenario
Basic Data:
Plant : TAJA
Company Code : 1000
Storage Loc : TA01
Material created :
Sir No Material Material Type
1 AIRCOIL FERT
2 CORE ROH
3 SLEEVE ROH
[Link] manufactures product in large,period based not… 2/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Repe ve manufacturing profile to control how you want to carry out planning and back flushing in repe ve
manufacturing
Basic control parameter of the REM Profile
1. Whether you want to backflush ac vi es.
2. Whether you want to work with repor ng points in make-to-stock REM
3. How you want to process errors which occur when back flushing
Create the REM Profile:
SPRO Produc on Rep manufacturing Control Data Create REM Profile Assistant (T-Codes: OPP3/OSP2)
With help of the REM profile assistant create the Make-to-Stock REM Profile “TJ” (REM Profile for plant TAJA)
here GI backflush at GR pos ng check mark and RP backflush is mandatory/Op onal(as per requirements)
Here Planned order reduc on period is given 3 , so In this period system reduces all planned orders and run
schedule quan es in the period
reduc on
[Link] manufactures product in large,period based not… 3/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Here below men on all movement type set for the REM profile TJ
Create the finished material Air coil with Repe ve mfg. indicator and REM profile TJ maintained in material master see
view MRP -4 , ( MM01)
[Link] manufactures product in large,period based not… 4/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Please create and maintained the BOM(CS01) and rou ng/Rate rou ng (CA01/CA21)
Rate rou ng for top material Air Coil and assigned control key to the opera on see in below pic, (T-codes: CA21),
here control key using for UK01 and UK02 for opera on. (Standard SAP control key with milestone confirma on is
PP01)
Create the Control key UK 02, with ‘milestone confirma on’ with help of the T-codes OP67.
The milestone confirma on is a special form of confirma on, in which the confirma on of one opera on causes
other opera ons or subopera ons to be automa cally confirmed at the same me.
[Link] manufactures product in large,period based not… 5/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Create the Produc on version T777 for finished material(Air coil) with help of material master change (MM02),
and in Selec on method put indicator 2 or 3.
Produc on version is combina on of the BOM and Rou ng/Rate Rou ng. Overview of the produc on
version T777, more than one produc on version created as per requirement and make sure current
prod. Version not locked.
[Link] manufactures product in large,period based not… 6/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
As per REM profile selec on for the product cost accoun ng
There are two different type of cost accoun ng exit.
1. Standard cost es mate per material.
You can create this cost es mate once in a period with reference to a rou ng. You can post ac vi es on the basis
of this cost es mate if you produce a material using only one produc on version in one period.
Using T-code: CK11N do the standard cost es mate for current date and period, And release this standard cost es mate
through T-code: CK24.
2. Preliminary cos ng for the product cost collector.
[Link] manufactures product in large,period based not… 7/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
You can create this cost es mate per produc on version. This makes sense if you produce one material using
different produc on versions and rou ng in one period.
Using T-code:KKF6N for create Preliminary cost es ma on in REM.
Here we selected preliminary cos ng for the product cost collector in REM profile
Create the [Link](PIR) for the finished material Air coil with help of the T-code: MD61
See the below pic of the stock requirement list a er genera ng the demand without run MRP. (T-codes : MD04 )
[Link] manufactures product in large,period based not… 8/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
A er run the MRP with help of the MD02 for finished material(Air Coil), MRP element is RS and order type is PE
In REM, we can do backflush(REM Confirma on) through planned order or finished material using MFBF, here we
selected the planned order
[Link] manufactures product in large,period based not… 9/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Checking with Post with correc on in tool bar of REM confirma on page before saving and get the detail
informa on of the all transac on variant with all detail.
A er saving system posted GR and GI document(As per REM profile se ng GR and GI done at same me)
[Link] manufactures product in large,period based n… 10/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
A er the confirma on of the both planned order, good receipt done automa cally and available stock is 20. MD04
Screen
With help of the Document overview on MFBF tab, we know the detail of the GR and GI transac on, and with
help of the Reverse tab we can reverse the process of movement and material back to the stock.
I prepared this document for the understand the basic step of the SAP REM process, and i hope this document
helpful to clear the basic concept of the REM process.
Request to expert please correct me if any thing missing or wrong in this document.
[Link] manufactures product in large,period based n… 11/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Umesh Mali
SAP PP-QM Consultant
Alert Moderator
Assigned tags
MAN Production Planning (PP) |
Related Blog Posts
SAP PP – REM Step with T-code
By Umesh Mali , Aug 08, 2014
LIST OF BAPI FOR PRODUCTION PLANNING MODULE
By Gyanaranjan Rout , Jul 12, 2013
MF50-Planning table basic step
By ganapathy s , Apr 08, 2015
Related Questions
Regarding SAP REM
By Former Member , Apr 18, 2008
REM scenario - Basic understanding
By Akash A , Sep 20, 2020
[Link] manufactures product in large,period based n… 12/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Planning Table in repetitive manufacturing
By Former Member , Dec 28, 2011
52 Comments
You must be Logged on to comment or reply to a post.
Former Member
May 13, 2014 at 8:19 am
Hi Umesh,
Good document.
Can you please add about MF50 Planning table transaction detail into it.....
Regards
Piyush
Like(0)
Umesh Mali | Post author
May 14, 2014 at 6:31 am
Hello Piyush,
Thanks, I will add the MF50 detail in this document.
Thanks & Regards
Umesh Mali
Like(0)
Former Member
May 16, 2014 at 7:28 am
Hi Umesh,
Add about MF50 planning table to make this doc perfect & complete.
Waiting.....
Thanks
Piyush
[Link] manufactures product in large,period based n… 13/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Like(0)
Umesh Mali | Post author
May 19, 2014 at 4:05 pm
Hello Piyush,
I will preparing planning table document and update very soon,,
Before end of this week,
Regards
Umesh Mali
Like(0)
Suresh Kumar
May 14, 2014 at 10:54 am
Heelo Umesh
Good Understanding [Link] you please Update Back ush Type,COGI processs
Suresh
Like(0)
Prashant Deshpande
May 14, 2014 at 1:44 pm
Hello Umesh, Document is very helpful..! Thanks
Like(0)
Umesh Mali | Post author
May 14, 2014 at 3:48 pm
Thanks Prashant ,,,,
Like(0)
mahesh kumar komatineni
May 15, 2014 at 11:27 am
Hi Umesh,
[Link] manufactures product in large,period based n… 14/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
thank you for sharing this valueble document. i tried it in my ides up to mfbf evererything ne there i am
fetting error. No gr with back ush in case of reporting point logic w auto gr option.
can youy please tell what i have to do to coplete mfbf.
Thanks®ards,
Venkat.
Like(0)
Umesh Mali | Post author
May 15, 2014 at 12:06 pm
Hello Venkat,
Thanks for go through this document,
Please check the which control key assign in routing/rate routing, Milestone confirmation maintained for the this
control key. Please make sure the RP backflush checked on MFBF screen ( Because in REM profile we maintained
the RP backflush Mandatory) and assign Operation number(Control key with milestone confirmation assigned)on the
the Reporting point field on MFBF screen,
If you want to run this process without reporting point then simply make change in REM profile, select the RM
backflush optional.
Revert back if facing any other issue,,
Regards
Umesh Mali
Like(0)
mahesh kumar komatineni
May 15, 2014 at 12:32 pm
Thank you umesh, gr posted.
Thanks&Regards,
Venkat.
Like(0)
mahesh kumar komatineni
May 15, 2014 at 12:37 pm
Hi Umesh,
what is the di erence between doing direct MFBF and doing MFBF after MF50.
[Link] manufactures product in large,period based n… 15/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Thanks&Regards,
Venkat.
Like(0)
Prince 99
May 15, 2014 at 1:23 pm
Hi Umesh,
Very clear concepts de ne by you.
Thanks for your e orts.
Shailendra
Like(0)
Umesh Mali | Post author
May 15, 2014 at 2:08 pm
Thank you Shailedra,,
Regards
Umesh Mali
Like(0)
Former Member
May 17, 2014 at 6:09 am
Thanks for sharing. Very informative material. Keep it Up.
Regards'
Muhammad Saleem
Like(0)
Former Member
May 17, 2014 at 6:14 am
Hi Umesh,
Clear interpretation of Repetitive Manufacturing.
[Link] manufactures product in large,period based n… 16/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Nice E ort!
Regards,
waqas
Like(0)
Former Member
May 18, 2014 at 6:30 am
Hi,
It very coveragable documents,nice work,
Devendra
Like(0)
Umesh Mali | Post author
May 19, 2014 at 4:08 pm
Hello,
Saleem, Ahmed, and Davendra thanks for compliment,,
Regards
Umesh Mali
Like(0)
Aditya S
May 29, 2014 at 11:11 am
Hi Umesh,
Yes, the blog is useful. Appreciate if you can mention clearly about signi cance of MF50 - Planning Table. Is
MF50 Mandatory or Optional etc.
Thanks for ur e orts.
Like(0)
Umesh Mali | Post author
[Link] manufactures product in large,period based n… 17/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
May 29, 2014 at 11:49 am
Hello Aditya ,,
Thanks for go through this document ,
MF50 is opetional in REM. I will prepare the document for MF50 and posting very soon (It's delay due to
o c work load )
Regards
Umesh Mali
Like(0)
Former Member
June 9, 2014 at 6:29 am
hi umesh
Thanks for this doc. It was helpful. Can you also highlight how settlement / variance is done in case of REM
with screen shots / T-codes. This will be helpful to me.
Regards
Sree
Like(0)
Rajender ch
June 18, 2014 at 7:46 pm
Hi Umesh,
Document is simple, clear, understandable and intresting & covered entire cycle. Really [Link].
Can you also cover the MF50, MTO Scenorio, example on Normal back using and Report point back
ushing, Activities posting during back using, how to collect and clear the errors in goods movement, liitle
bit costing side(example on Preliminary costing and standard costing, Variance calculation, settlement) also
please mention the Important T codes for reports (information).
Thanks for providing useful document. keep it up.
Like(0)
Former Member
[Link] manufactures product in large,period based n… 18/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
June 28, 2014 at 6:21 am
Hi Umesh,
Thanks a Lot for this doc.
It is very good & helpful.
Like(0)
Umesh Mali | Post author
July 17, 2014 at 4:32 pm
Hello all,,
Thanks sreekantha, Raj and SAP PPQM for valuable compliment,,,
Regards
Umesh Mali
Like(0)
Eric Chen
July 24, 2014 at 6:58 am
Hi Umesh,
good documentation, very useful to understand the basic process of REM.
thanks a lot for sharing.
Like(0)
Former Member
July 26, 2014 at 10:40 am
Thanks Umesh............
for sharing documentation
Like(0)
[Link] manufactures product in large,period based n… 19/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Umesh Mali | Post author
August 5, 2014 at 2:24 pm
Thanks Chen and Pranav,,,
Like(0)
SAP PP_QM
September 25, 2014 at 9:40 am
Hi Umesh,
Please create new document that explains REM Pro le details.
Like(0)
Umesh Mali | Post author
September 26, 2014 at 1:41 pm
Hello Avinash,
Surely, I will create REM Pro le Document
If you have any issue regarding REM pro le, you can directly post here also
Regards
Umesh Mali
Like(0)
Former Member
September 26, 2014 at 11:54 am
Hi Umesh,
A really good document! keep up the good job.
Like(0)
Umesh Mali | Post author
September 26, 2014 at 1:45 pm
Hello CB
Thanks for Compliment...!!!
[Link] manufactures product in large,period based n… 20/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Regards
Umesh Mali
Like(0)
Former Member
November 8, 2014 at 3:32 pm
hi umesh,
very very good document! thank you very much sharing this very useful to me.
Regards
surya
Like(0)
Umesh Mali | Post author
November 10, 2014 at 4:39 am
Hello Surya,,
Thanks for reviewing this document,,
Regards
Umesh Mali
Like(0)
Mohd Tallha Sonalkar
November 9, 2014 at 8:32 am
Excellent Document Umesh ,
Keep it up ,
Please keep us posted with your latest documents
Regard's
Tallha
Like(0)
[Link] manufactures product in large,period based n… 21/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Umesh Mali | Post author
November 10, 2014 at 4:44 am
Hello Tallha,,
Thanks for reviewing this document ,,,
Your compliment,Rating and like are motivated me for posting more document,,
Regards
Umesh Mali
Like(0)
Former Member
November 30, 2014 at 5:18 am
hello ,
umesh good thank you for this document
plz help me i want SAP PM full [Link] have send me this mail:
suri403@[Link]
Like(0)
Former Member
April 28, 2015 at 7:35 am
hi Umesh
It was a very good document,
Thanks alot for drawing clear picture
regarding REM
Like(0)
Irala Damodara reddy
May 7, 2015 at 8:01 am
good..
Like(0)
[Link] manufactures product in large,period based n… 22/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Umesh Mali | Post author
May 8, 2015 at 4:34 am
Thanks Shreyas and Damodar..
Regards
Umesh Mali
Like(0)
Former Member
May 18, 2015 at 1:21 pm
Thanks for sharing the document. It is very helpful for the beginners.
Regards,
Sk. S Alisha
Like(0)
Umesh Mali | Post author
May 18, 2015 at 5:37 pm
Thanks Alisha...
Like(0)
nittala sreenivas
February 10, 2016 at 11:54 am
Dear Umesh,
Thank you very much for the document. I tried the scenario and got the result as well and now i am
con dent enough with respect to the REM process whereby i feel that i know some good initial knowledge in
SAP PP
With best regards,
Sreenivas Nittala
Like(0)
[Link] manufactures product in large,period based n… 23/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Michael Kozlowski
February 13, 2016 at 5:43 pm
really a very valuable document
Best regards
Michael
Like(0)
jayadeep uppalapati
February 15, 2016 at 9:17 am
Hi Umesh,
Thank You
Regards,
Jayadeep
Like(0)
Former Member
February 22, 2016 at 2:46 pm
Hi Umesh,
Very useful to understand the basic process of REM.
thanks a lot for documenting and sharing.
Regards,
Ravindhar m
Like(0)
Kanishk Bohra
March 22, 2016 at 2:12 pm
Amazing document umesh !
Like(0)
[Link] manufactures product in large,period based n… 24/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Jasvin Tan
July 26, 2017 at 1:18 am
Appreciated your e ort Umesh.
Hope you'll post more documents in the future.
Thanks
Like(0)
Jerson Medina Salmeron
August 23, 2017 at 4:11 pm
Pretty good SAP PP REM process description. Regards ¡
Like(0)
Umesh Mali | Post author
September 13, 2017 at 7:28 am
Hello Jerson,
Thanks for comment..
Regards
Umesh Mali
Like(0)
Samuel Pires
November 21, 2017 at 10:02 am
Hello, trying to implement REM, but have one big problem with Costing, can you see at: here
Like(0)
Vivek Tiwari
June 20, 2020 at 7:09 pm
Please update it, sir
[Link] manufactures product in large,period based n… 25/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
thanks for this document
Like(0)
S Abinath
June 21, 2020 at 3:49 pm
Hi,
Good article easy to understand
Like(0)
Dhiraj Dua
September 11, 2020 at 3:10 pm
Hi,
Your e orts are really appreciated. It will be very great full if you write blog on production line design, line
hierarchy, line balancing.
Regards,
Dhiraj Dua
Like(0)
Find us on
Privacy Terms of Use
Legal Disclosure Copyright
Trademark Cookie Preferences
[Link] manufactures product in large,period based n… 26/27
2/11/2021 SAP REM full cycle scenario with basic step | SAP Blogs
Newsletter Support
[Link] manufactures product in large,period based n… 27/27