Process Name Heat treatment
Requirement Heat treatment is done as per the specified temperature
Potential Failure Mode Heat treatment is not done as per the specified temperature
may be high or low
Potential Effects of Failure 1. Mechanical properties not achieved(Hardness, Tensile
Strength ,Yield Strength,% elongation, Reduction area,
Impact strength)
[Link] properties not achieved(Microstructure and
macrostructure, grain size, delta ferrite)
Potential Causes of Failure 1. Temperature indicator are not calibrated
[Link](job & furnace) are not calibrated
[Link] treatment cycle was not followed
4. Unskilled work man.
Current Process Control Prevention 1. Technology sheet or work instruction.
[Link]/Process
3. Training is provided as per the training calendar.
4. Calibration as per schedule.
[Link] monitoring through Time-Temperature cycle graph
through job and furnace thermocouple.
Current Process Control Detection [Link] Log book
[Link] Sheet.
[Link] Audits and daily reviews
[Link] calendar
[Link] report
R.P.N(Risk Priority Number)<=100 S= 8 O= 2 D=5 R.P.N=80
R.P.N=Occurrence*Severity*Detection
Mitigation action Plan: if R.P.N is greater
than 100 or severity rating is greater than
8
Responsibility for implementation of
mitigation plan
Monitoring and effectiveness
PREPARED BY APPROVED BY CONTROLLED BY