Tugas Teknik Pemboran 1
Rizky Andre Saputra (113170065)
Kelas C
depth (ft) pressure (Psi) EMW (ppg)
5000 2340 9.30 pressure
5100 2390 9.31 EMW = +trip margin(0.3)
0.052∗depth
5200 2435 9.31
5300 2480 9.30
5400 2660 9.77
5500 2775 10.00
5600 2850 10.09
5700 2970 10.32
5800 3320 11.31
5900 3375 11.30
6000 3200 10.56
6100 3015 9.81
6200 3120 9.98
Diperlukan 100 bbl lumpur
Berapakah kebutuhan
Bentonite (SG=2.65)
Air (SG=8.33)
Barite (SG=4.9)
bila Low Solid Content maksimum hanya 6%
Mud lama (air + bentonite)
(dmb−dml)
%Vs= ∗100 %
(ds−dml)
( dmb−8.33)
0.06= ∗100 %
(2.65∗8.33−8.33)
dmb = 9.15 ppg
Berat barite
( dmb−dml)
Ws= x ds∗Vmb
(ds−dml )
(11.31−9.15)
Ws= x 4.9 x 8.33 x 100 x 42
( 4.9 x 8.33−9.15)
Ws = 11658.68 lbs
Volume mud lama (air + bentonite)
Vml = Vmb - Vs
Ws
Vml=Vmb−
SG barite x ρ air x 42
11658.68
Vml=100−
4.9 x 8.33 x 42
Vml = 93.20 bbl
Berat bentonite
( dmb−dml)
Ws= x ds∗Vmb
(ds−dml )
( 9.15−8.33)
Ws= x 2.65 x 8.33 x 93.20∗42
(2.65 x 8.33−8.33)
Ws = 5184.46 lbs
Volume air
Vml = Vmb - Vs Ws
Vml=Vmb−
SG bentonite x ρ air x 42
5184.46
Vml=93.20−
2.65 x 8.33 x 42
Vml = 87.61 bbl
Jadi volume & berat komponen yang dibutuhkan adalah
Volume air = 87.61 bbl
Berat bentonite = 5184.46 lbs
Berat barite = 11658.68 lbs