Account Account Weight
Technical 5
Financial 3
Schedule 2
Sub-Account
Construction
Impact on existing SCS infrastructure
Material availability
Reliability / Risk
Constructability
Flexibility to increase capacity in the future
Capital Cost
Project scheduling
Account Sub-Account
Construction
Impact on existing SCS
infrastructure
Material availability
Technical
Reliability / Risk
Constructability
Flexibility to increase capacity in the
future
Account Sub-Account
Financial Capital Cost
Account Sub-Account
Schedule Project scheduling
Sub-Account Description Sub-Account Weight
-Construction methods and materials are familiar to SMCV (or its
contractors). 3
-Concepts have been successfully implemented by SMCV (or its
contractors) previously.
-The impact that each alternative will have on the existing
2
infrastructure such as the containment wall, liner, abutments, others.
-Availability of construction materials. 2
-Possibility of slope failure, risk of loss of water retention if a failure
were to occur, that could potentially impact the WWTP. 4
-Long-term reliability of design.
-Complex, difficult, or laborious construction procedures could result
in delays, non-compliant quailty standard, equipment/material 3
damages, or additional safety hazards.
-Flexibility to increase capacity (by raising the crest) to meet the
5
requirements for the mine closure conditions.
Sub-Account Description Sub-Account Weight
-Cost to construct each alternative. 3
Sub-Account Description Sub-Account Weight
-Time to construct each alternative. As an assumption, the time of
3
procurement of materials has been excluded.
Metrics
5: High familiarity and previous experience
4: Moderate
3: Moderate to low
2: Low
1: No faimiliarity and previous experience.
5: No impact
4: Low
3: Moderate to low
2: Moderate
1: High impact
5: Material available within 5 km
4: Material avialable within 5-20 km
3: Material available > 20 km away.
2: Material will take more than a week to
arrive to site.
1: Material unavailable
5: Low to none possibility
4: Low
3: Moderate to low
2: Moderate
1: High
5: Low to none complexity
4: Low
3: Moderate to low
2: Moderate
1: High
5: High Flexibility
4: Moderate
3: Modetae to low
2: Low
1: No flexibility
Metrics
5: most preferable cost
4:
3:
2:
1: less preferable cost
Metrics
5: most preferable duration (days)
4:
3:
2:
1: less preferable duration (days)