TABLE OF CONTENTS
Abstract I
Company Profile II
Tables
1. List Of Figures III
2. List Of Tables IV
Abbreviations V
Notations VI
Chapter: 1 Introduction 1
1.1 Project Summary 2
1.2 Project Purpose 2
1.3 Project Scope 2
1.4 Project Objectives 3
1.5 Technology Review 6
1.6 Literature Review
Chapter: 2 Project Management 11
2.1 Project Planning 12
2.2 Project Scheduling 14
2.3 Risk Management 16
2.4 Canvas Designing 18
2.4.1 AEIOU Summary
2.4.1.1 Activities
2.4.1.2 Environment
2.4.1.3 Interactions
2.4.1.4 Objects
2.4.1.5 Users
2.4.2 Empathy Summary
2.4.3 Ideation
2.4.4 Product Development
Chapter: 3 System Requirements Study
3.1 User Characteristics
3.2 Hardware and Software Requirements
3.3 Specific Requirements
3.3.1 Functionality
3.3.2 Usability
3.3.3 Reliability
3.3.4 Performance
3.3.5 Supportability
3.3.6 Design Constraints
3.4 Assumptions and Dependencies
Chapter: 4 System Analysis
4.1 Requirements of New System
4.2 Feasibility Study
4.3 Requirements Validation
4.4 Features Of New System
4.5 For OO Approach (If you are following OO Design)
4.5.1 Class Diagram
4.5.2 System Activity Diagram
4.5.3 Use case Diagram
4.5.4 Sequence Diagram
4.5.5 Collaboration Diagram
4.6 For Conventional Approach (If you are following Procedural
Design)
4.6.1 Process Flow Diagram
4.6.2 Context Diagram
4.6.3 Data Flow Diagram
4.6.4 ER Diagram
Chapter: 5 System Design
5.1 Database Design
5.2 Input-Output Design(if applicable)
Chapter: 6 Limitation and Future Enhancement
6.1 Limitation
6.2 Future Enhancement
Chapter: 7 Conclusion and Discussion
7.1 Self Analysis of Project Viabilities
7.2 Problem Encountered and Possible Solutions
7.3 Summary of Project work
Chapter: 8 References
Appendix 1: Periodic Progress Report IX
Appendix 2: Design Engineering Canvas XIII
Appendix 3: PSAR Report XV