Time Frame of 6S Implementation
Activity November December January
1 2 3 4 1 2 3 4 1 2 3
Phase 1 (Plan)
Formation of 6S Council
Identify and Set Up 6S Zones
6S Training to all Faculty involve
Launch 6S Program
Phase 2 (Do)
Sort
Identify What is Needed, Amount Needed and When it is Needed
Red Tagging and Evaluation
Set In Order
Label all shop work area (Welding area, Fabrication Area, etc)
Time Frame of 6S Implementation
Activity November December January
Mark reference materials/documents with an oblique line to detect disorder
from a distance.
Put names and numbers (codes) on all equipment and tools.
Store tools beside the machine with which they will be used according to
sequence of work operations.
Organize and store using color code to make it easy to identify materials at a
glance. (ex. Plate and pipe color code)
Label clearly each item and its storage area (Visual Control)
Store similar items together.
Store different items in separate rows.
Floor Paint those walkways, forklift and equipment paths, work areas, as well
as locations for pallets, raw materials, finished goods, shipping, and other static
locations.
Implement reorder signal (Cards) for stocks reorder
Shine
Delegate Cleaning Assignments.
Determine what are to be Cleaned.
Time Frame of 6S Implementation
Activity November December January
Determine the Methods to be Used
Prepare the Cleaning Tools and Materials
Standardized
Provide Maitenance schedules and checklist to all MAKANA tools and
Equipment
Make a Work Instructions
Prepare Work flow for all internal activities within MAKANA
Document Numbering
Quality inspections SOP/ Hold points
Sustain
Create a 6S Board / Information Board
Time Frame of 6S Implementation
Activity November December January
Photos of Before and After 6S
Safety
Safety Monitoring
Phase 3 (Check)
6S Audit
Phase 4 (Act)
Identify KPI and bechmark
y February
4 1 2 3 4
y February
y February
y February