Teacher Performance Evaluation Metrics

This document outlines the key result areas, objectives, timelines, weights, performance indicators, and actual results for evaluating a teacher's performance. It includes categories for teaching-learning process, pupils' learning outcomes, community involvement, and professional growth. Specific objectives are provided for preparing lesson plans, facilitating learning, monitoring attendance, evaluating pupil progress, supervising activities, visiting parents, conducting parent-teacher meetings, supporting projects, participating in school activities, and completing a master's degree program. Performance is rated on a scale of 1 to 5 based on achievement of objectives and indicators.

Uploaded by

limboy15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16K views4 pages

Teacher Performance Evaluation Metrics

This document outlines the key result areas, objectives, timelines, weights, performance indicators, and actual results for evaluating a teacher's performance. It includes categories for teaching-learning process, pupils' learning outcomes, community involvement, and professional growth. Specific objectives are provided for preparing lesson plans, facilitating learning, monitoring attendance, evaluating pupil progress, supervising activities, visiting parents, conducting parent-teacher meetings, supporting projects, participating in school activities, and completing a master's degree program. Performance is rated on a scale of 1 to 5 based on achievement of objectives and indicators.

Uploaded by

limboy15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

MFOs KRAs OBJECTIVES TIMELINE WEIGHT PERFORMANCE INDICATOR ACTUAL

RESULTS
RATING SCORE
Teaching-Learning Process Prepared daily lesson log of
activities in 6 learning areas
including appropriate
instructional materials
June -
March
20% 5 Objective was specific, measurable,
attainable, result-oriented and time-bound
4 Objective was stated with 1 behavioral
indicator is missing
3 Objective was stated with 2 behavioral
indicator is missing
2 Objective was stated with 3-4 behavioral
indicators missing
1 Objective was stated without behavioral
indicators

Facilitated learning for 30 out 0f
59 pupils in the classroom
through the use of daily logs and
various teaching strategies.
June -
March

5 Teaching methods and strategies elicited
130% and above interaction from a class
4 Teaching methods and strategies elicited 115
129% used in teaching a lesson
3 Teaching methods and strategies elicited 100
114% interaction from a class
2 Teaching methods and strategies elicited 51
99% interaction from a class

Pupils Learning Outcomes Monitored/checked attendance
of 40 out of 59 pupils in the
classroom regularly.
June -
March
30% 5 Attendance checking was 130% and above
systematically carried out
4 Attendance checking was 115 129%
systematically carried out.
3 - Attendance checking was 100 114%
systematically carried out.
2 - Attendance checking was 51 - 99%
systematically carried out.
1 - Attendance checking was 50% and below
systematically carried out.

Maintained and evaluated 40 out
0f 59 pupils progress within the
rating period
June -
March
5 Class record reflected the bases of 130% and
above of pupils ratings in all subject areas
handled
4 Class record reflected the bases of 115

129% of pupils ratings in all subject areas
handled
3 Class record reflected the bases of 100
114% of pupils ratings in all subject areas
handled
2 Class record reflected the bases of 51 99%
of pupils ratings in all subject areas handled
1 Class record reflected bases of 50% and below
of pupils ratings in all subject areas handled.
Supervised curricular/ co
curricular activities to 30 out of
59 pupils in the classroom.
June to
October
5 Curricular/ co curricular activities were 130%
and above supervised systematically in all
learning areas
4 - Curricular/ co curricular activities were 115
129% supervised systematically in all learning
areas
3 - Curricular/ co curricular activities were 100
114% supervised systematically in all learning
areas
2 - Curricular/ co curricular activities were 51
99% supervised systematically in all learning
areas
1 - Curricular/ co curricular activities were never
supervised systematically in all learning areas


Community Involvement Visited parents of 20 out of 60
pupils needing follow-up within
the rating period.
June -
October
25% 5 130% and above of set visits successful
intervention
4 115 129% accomplishment of visits with
partial success in implementation of
interventions
3 - 100 114% accomplishment of visits with
suggested planned interventions
2 51 99% accomplishment of visits with
planned interventions
1 50% and below accomplishment with no

interventions
Conducted regular PTA
meetings/conference in every
rating period.








June to
March
5 - 130% and above accomplishment with set
agreements met
4 115 129% of planned meetings conducted
producing only set agreements and partial
accomplishment of these
3 100 -114% of planned meetings conducted
producing set of agreements
2 51 -99% of planned meetings conducted with
minimal results
1 50% and below of planned meetings
conducted with no results.


Supported/ initiated activities
and projects of general PTA
June -
March
5 130 % and above project accomplishment
with full documentation report on completion
4 115 129% project accomplishment with
partial completion
3 100 114% project initiative only with no
completion report
2 51 99% project initiative only with no
completion
1 No project/activities supported or initiated

Professional Growth and
Development
Participated in co-curricular/
school activities within the rating
period
June -
October
25% 5 Participated at least 2 co curricular with
documented results
4 Participated in co curricular activities with
documented results
3 Participated in most of co curricular
activities with documented results
2 Participation only without documented
results
1 No participation in school activities.

Accomplished/ earned at least 18
units in Master of Arts in
Education major in Educational
June -
March
5 Accomplished 18 units within the target date
with certification on completion
4 Accomplished 15 units within the target date

Management within the target
date.
with certification on completion
3 Accomplished 9 - 12 units within the target
date with certification on completion
2 Accomplished 9 units within the target date
without certification on completion
1 No accomplished units and no certification on
completion