3.0 KOSITEMITEMKERJA 3.
4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) *PURATAKADARHARGA KERJA (RM)
BIL
KETERANGANKERJA
UNIT
A 1 2 3 B 1
InsituConcrete ConcreteGrade10asblinding ConcreteGrade15asblinding ConcreteGrade20asblinding ReinforcedConcrete ReinforcedconcreteGrade20inbases, footing,pilecapsorgroundslabs
M3 M3 M3
200.00 187.00 226.67
200.00 200.00
200.00 194.00 227.00
M3
200.00
200.00
200.00
ReinforcedconcreteGrade25in structure ReinforcedconcreteGrade30inpile caps ReinforcedconcreteGrade30in structure ReinforcedconcreteGrade35in structure ReinforcedconcreteGrade40in structure BarReinforcement Mildsteelbarreinforcement;6mm diameter Mildsteelbarreinforcement;10mm diameter
M3
220.00
220.00
220.00
M3
250.00
250.00
250.00
M3
280.00
280.00
280.00
M3
297.00
300.00
299.00
M3
300.00
300.00
C 1
KG
2.80
2.80
3.00
KG
2.99
2.98
3.00
*PurataKeseluruhan(roundedup)yangditetapkan
13
3.0 KOSITEMITEMKERJA 3.4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) 3.25 3.33 *PURATAKADARHARGA KERJA (RM) 3.00
BIL
KETERANGANKERJA
UNIT
Mildsteelbarreinforcement;16mm diameter Hightensilebarreinforcement;10mm diameter Hightensilebarreinforcement;12mm diameter Hightensilebarreinforcement;16mm diameter Hightensilebarreinforcement;20mm diameter FabricReinforcement SteelfabricreinforcementBMCA10 SteelfabricreinforcementBMCA6 SteelfabricreinforcementBRCA7 SteelfabricreinforcementBRCA8 Formwork Sawnformworktosidesandsoffitof beam Sawnformworktosidesofwall Sawnformworktowall,slabsorbeams
KG
KG
3.33
3.30
3.00
KG
3.93
3.83
4.00
KG
3.94
3.15
4.00
KG
3.83
3.30
4.00
D 1 2 3 4 E 1
M2 M2 M2 M2
32.22 13.30 20.00 19.40
25.00 13.30 20.00 19.40
29.00 13.00 20.00 20.00
M2
33.50
40.00
37.00
2 3
M2 M2
32.00 35.22
32.67 32.50
32.00 34.00
Fairfinishformworktosidesandsoffitof beam Fairfinishformworktosidesofwall
M2
26.50
26.50
27.00
M2
42.80
39.50
41.00
*PurataKeseluruhan(roundedup)yangditetapkan
14
3.0 KOSITEMITEMKERJA 3.4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) *PURATAKADARHARGA KERJA (RM)
BIL
KETERANGANKERJA
UNIT
F 1
PrecastConcrete Precastconcretebeamcompletewith reinforcement,formwork,jointsand finishes
65.00
65.00
*PurataKeseluruhan(roundedup)yangditetapkan
15