Pick the right
tenders.
Win them
more often.
From the tender notice to the submitted bid: we find tenders that fit your company, check the documents and compare subcontractor quotes. Your estimator decides.
Free pilot on one live tender.
as required by site conditions.
Gaps in tender documents found too late cost margin.
bids rejected on average per public works procurement in 2025, up from 1.94 in 2024
Public Procurement Office, report for 2025of the projects studied in Europe had design errors; costs overran budgets by 38.1%.
HKA CRUX Insight IX, October 2026, 2,410 projects with claims and disputesMargin is decided before the contract is signed.
The whole bid process works on it: picking the tender, asking the contracting authority, comparing subcontractor quotes. A gap left unclarified ends up in your price as risk, or as a cost after signing.
In Polish public works, over 52% of cancelled tenders were cancelled because bids exceeded the authority’s budget.Public Procurement Office (UZP), report for 2025
Each gap gets a decision before the deadline for questions: ask the contracting authority, price it as a risk, or write it down as a bid assumption.
The register of bid assumptions is yours to use later as evidence for claims.
Lower bid risk and much less time on the documents. Your estimator steers every decision.
The pilot is free, on one live tender.
Pick one module or several.
Each works on its own. Together they cover the whole bid process.
-
Module 1
Tender search
Less time on notices that do not pay off
- Notices matched to your company profile
- A first match against the participation conditions
- Key requirements and deadlines in one place
Notice · example dataSchool retrofitSee the example ↓Value€1.05mQuestions by2 DecemberTo decide: 3 of 4 conditions met, 1 to check -
Module 2
Tender check
Before the question deadline
- Contradictions and unclear lines, each with a quote
- Gaps and risks by priority, for your estimator
- Draft questions for the contracting authority
Finding 3 of 14 · contradiction · highThe contract asks you to price works shown on drawing A-102. That drawing is missing.See the full example ↓ -
Module 3
Subcontractor quote comparison
Before you compare prices
- Quote scope against the bill of quantities
- Exclusions and price validity
- All quotes in one template
Drywall · 3 quotesSee the full example ↓Quote ANo scaffoldingQuote BPrice valid 30 daysQuote CNo issues -
Module 4 In development
Bid builder
Less retyping
- A bid from ready, checked blocks
- A draft based on the tender documents
- Links to the tools you write bids in today
Bid draftI want to test it →BLOCKPayment termsBLOCKScheduleBLOCK60-month warranty
From the link to a decision in four steps.
- 1You send the linkto a live tender, or its documents.
- 2We read the documentsAn expert reviews every result.
- 3You get the gap listContradictions, unclear lines, gaps and risks, each with a quote.
- 4You and your bid team decidewhether to bid, what to price and what to ask the contracting authority.
Which tenders are worth pricing at all?
You get notices matched to your company profile, with the participation conditions checked first. You drop the ones that do not pay off before your bid team opens the documents.
- Clinic extension€2.95m · questions by 9 DecemberParticipation conditions4 of 4 metWorth pricing
- School retrofit€1.05m · questions by 2 DecemberParticipation conditions3 of 4 met · to check: experience with school buildingsTo decide
- Warehouse hall€6.5m · questions by 4 DecemberParticipation conditions2 of 4 · value above your profile, required turnover €10mOutside your profile
For bid teams that read many notices and price only some of them.
One clause as written. The same clause as delivered.
A list of findings, each with a priority, a quote from the document and a draft question to the contracting authority. Drag the divider across the example, or switch it with the buttons below.
Example: school extension · fictional data
4.2 The Contractor shall price all external works shown on drawing A-102.
- A-100Site plan
- A-101Ground floor plan
- A-103Sections
- A-104Elevations
4.2 The Contractor shall price all external works shown on drawing A-102.3
- A-100Site plan
- A-101Ground floor planA-102 · not in the set
- A-103Sections
- A-104Elevations
Drawing A-102 is named in the contract but is not in the tender documents.
“…price all external works shown on drawing A-102.”
“Please publish drawing A-102, or confirm which external works the bid should price.”
As written on the left: clause 4.2 names drawing A-102, and the register does not list it. As delivered on the right: the gap, its priority, the quote and the draft question. Drag the divider to the left.
We take the document work off your bid team, so your team spends its time on the price and the decisions. Fewer gaps slip into your price unnoticed; your estimator steers every decision.
Your estimator verifies and decides; we do the reading.
We read and prepare
Example gap · fictional
Plaster: 1,240 m² in the bill, 1,410 m² in the specification “Machine gypsum plaster, 1,410 m²” · Spec., 4.2- aAsk the contracting authority
- bPrice it as a risk
- cWrite it down as a bid assumption
Your estimator: what is true for this gap?
Tick what holds. Each tick shows what to weigh; there is no verdict.
-
Answers to questions are public, so not every gap should be asked.
-
A gap you do not clarify ends up in your price as risk, or as a loss.
-
Price it as a risk, or write it down as a bid assumption.
Subcontractor quotes, checked before you compare prices.
- Scopecompared line by line with the bill of quantities
- Exclusionsflagged
- Price validityset against your bid validity
- One templateall quotes in one layout, ready to compare prices
Your bid validity: 90 days
| Quote | Scope vs bill | Exclusions | Price valid | Unclear items |
|---|---|---|---|---|
| Subcontractor A | 38 of 38 lines | Scaffolding | 90 days | None |
| Subcontractor B | 38 of 38 lines | None | 30 days | None |
| Subcontractor C | 38 of 38 lines | None | 90 days | Line 14 unclear |
Main contractors with many subcontractors feel this most.
Why DO OK?
We have built software for construction and real estate since 2010. That experience goes into every tender check. tenderreview.com is our service for general contractors.
- 16 years
- in business, since 2010
- 150
- clients
- NPS 76
- client recommendation score (−100 to 100)
- 10+
- countries with delivered projects
We know the industry
We work for contractors, developers and property managers.
- Simulation editor for a marine works contractor
- Smart HVAC platform for commercial buildings
- Unibail-Rodamco, Sensio, BEHA, FellTech, Opt-E and others
We protect your data
Your documents stay in the EU and are never used to train AI models. We can work in your infrastructure.
Knowledge from years of projects
Sixteen years with the real estate industry taught us where costs hide in tender documents. We use that knowledge in every list of findings.
A construction tender expert works with the team.
“For us, DO OK is an extension of our department, not just a supplier.”
- 4.7/5average of 43 reviews on Clutch
- 34thDeloitte Technology Fast 50 Central Europe
- SoDAco-founder of the Polish IT companies association
- MediaThe New York Times, Financial Times, Forbes, CNBC
More about the company, the team and our work.
Before you send us a tender.
Plain answers to what bid teams ask first.
You don’t know our tender like we do.
Your estimator verifies and decides; we do the reading.
Is my tender confidential?
Your documents stay in the EU and are never used to train AI models; we can work in your infrastructure.
What does it cost to try?
A free pilot on one live tender.
Does a person check the result?
An expert in the loop reviews every result.
Which documents do you read?
We review your tender documents (terms of reference, functional and utility programme, bill of quantities, specifications, contract template, indexation clause) before the deadline for questions.
Which question deadline applies to me?
The deadline for clarification questions in your tender, set by procurement law and the tender terms. You find it in the tender terms.
What does my managing director get out of it?
A register of bid assumptions you can use later as evidence for claims.
What about subcontractor quotes?
Yes: we check scope line by line against the bill of quantities, collect exclusions, compare price validity with your bid validity and put all quotes in one template.
See how it works for your company. On one live tender, free.
Send the link to the tender, or its bid deadline. We reply, and you send the documents.
How DO OK handles your details: privacy policy.
Rather talk first? Book a short call by e-mail.